• Home
  • Onyx Collection
  • Milestone Acrylic
    • Acrylic Wall Systems
    • Acrylic Accessories
  • Shower & Tub Doors
  • Gallery
  • Our Installation process
  • Remodel Financing
  • Interactive Pricing Table
  • Pay Online
  • More
    • Home
    • Onyx Collection
    • Milestone Acrylic
      • Acrylic Wall Systems
      • Acrylic Accessories
    • Shower & Tub Doors
    • Gallery
    • Our Installation process
    • Remodel Financing
    • Interactive Pricing Table
    • Pay Online
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Onyx Collection
  • Milestone Acrylic
    • Acrylic Wall Systems
    • Acrylic Accessories
  • Shower & Tub Doors
  • Gallery
  • Our Installation process
  • Remodel Financing
  • Interactive Pricing Table
  • Pay Online

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

OUR PROCESS FROM START TO FINISH.

Upon Arrival

Beginning Installation. Setting The Base Or Tub.

Upon Arrival

Upon arrival one of our  technicians will review the scope of work with you to ensure that all materials are the style and colors that are expected, then 

all floors will be covered with drop cloths to keep your flooring safe and protected 

Demo Process

Beginning Installation. Setting The Base Or Tub.

Upon Arrival

The first step before the demolition process will be to shut the water supply off at the meter. You can expect it to be off for approximately 2-3 hours.

Your current tub or shower walls will be removed along with the tub or shower base.

Then the area will be cleaned and any additional framing or wall studs will be addressed at this time if needed.

Beginning Installation. Setting The Base Or Tub.

Beginning Installation. Setting The Base Or Tub.

Beginning Installation. Setting The Base Or Tub.

The installation will begin with 

 Verifying that the floor is firm and structurally
sound. If the floor has any flexibility. We will add support
where needed.
Then we make sure that the floor is level, flat, and clean.
If the floor is not level, we use thinset or another
leveling mix as needed (let harden before setting the
base). 

Now were ready to set to set the base or tub.

Installing Shower Walls Or Tub Surround

Installing Shower Walls Or Tub Surround

Beginning Installation. Setting The Base Or Tub.

Once the base is set we will begin to install the walls.

 When there is a ceiling panel, the ceiling panel will
be installed first. The back panel is installed next and
the side panels are installed last. 

We start by building a template for each wall. This ensures that all cuts are precise and that all side panels have minimal gapping.

  Dry-Fitting of 

 the wall
panels will be next.

Then we will do  any necessary
trimming of the panels before applying any adhesive. 

Accessories And Shower Doors

Installing Shower Walls Or Tub Surround

Accessories And Shower Doors

Once the walls are installed it's time to install any accessories such as soap caddies, grab bars, and seats.

Shower doors are the last to be installed.

Final Process

Installing Shower Walls Or Tub Surround

Accessories And Shower Doors

Once the accessories and doors are installed we then use Color Match seam fill silicone to seal all seams between wall panels, between panels and the base, and around any accessories, trim, and shower doors

Complete

Complete

Complete

A final clean and inspection is performed and now you can enjoy your beautiful new bath Oasis.  